System Solution 2

System Solution 2

A complete system solution for a manufacturer of copper wire rope droppers to the railway authorities.
This station is fully automized and protected for highest safety requirements. Fully computerized control with lenght pre-setting, batch numbering and test certificates.
The wire rope is uncoiled and cut to a pre-set lenght. Special fittings are assembled and pressed automatically. After the pressing in two stations the dropper is proof tested. The next station labels the dropper and finally it is coiled and packed.
Full documentation are stored into the computor network.
 
This is a sample of our complete responsibility in system design project.
 
Use our knowledge for your splicing problem!
Present your problem and we will come back to you with a solution proposal.
Category: